Votre navigateur est obsolète !

Pour une expériencenet et une sécurité optimale, mettez à jour votre navigateur. Mettre à jour maintenant

×

Olivier MENDEZ

Senior Executive Instrument & Test Methods

Olivier MENDEZ
48 years old
Driving License
Arles (13200) France
Professional Status
Employed
Available
About Me
I'm looking for executive’s positions in projects management, commissioning, methods and maintenance departments or else in research and development engineering. all in accordance with the experience and educations degree.

Executive with instrumentation specialty and tests, I own an experience of 15 years in projects, tests, methods and industrial maintenance in almost all of industry sectors. The positions held endow me with methods and strong multi-technical knowledges. I’m able to implement and consider the triple constraint: objectives, costs, deadlines for managing a projects and tests methods of high-level during all the process progress.
  • Overall tests engineer on french nuclear market
  • Partnership working with EDF
  • Overall test of as part of maintenance, modifciations, improvments, constructions, commissionnings
Detailed Description
  • Steam Generator Replacement
  • Control System Modification
  • Control system modeling by using the Arcadia method via Capella software as part of MBSE
  • Steam Generator effluents treatment and cleaning, operations and testing manager on effluent treatment unit (Fenton process) following Steam Generator cleaning
  • Operations manager for primary circuit decontamination
  • Instruments revamping management
  • Management: 60 peoples
  • Project management
  • Project Budget : 7 M€
  • Management: 60 peoples
Detailed Description
  • Conversations with clients and synthesis of issues
  • Establishment of a plan, of a roll-out and a reports of the tests
  • Matrial definition, choices and orders in accordance with clients expectations while respecting the triple constraint of the targets / costs / deadlines linked to our subcontractor position
  • Buisness and management of our subcontractors to synchronize the progress with the tests plan
  • Punch-lists management
  • Identification and instrumentation work costing who are exclude of the initial contract
  • Operational Systems Management
  • Head of Control Department
Detailed Description
  • Team management of 15 executives to drive 115 workers to absorb the activity load asked by client.
  • Project Management : planning, client interface, remove constraints - punch-list treatment - dispatching and arbitration of the actions towards the actors
  • Management of 30 technicians. Wiring Control – Unwinding - Ground connection – Reports – Punch List
  • On job training, 6 peoples
  • Expertise in metering
  • Management of more than 700 metering equipment’s spread over 60 platforms and sites
  • Direct Management: 8 peoples
  • Sub-contract supervision and supplier(s)
  • Metering costing exercise
  • Interservice coordination
Detailed Description
  • Metering control calculations in accordances with standards
  • Management of custody and masters equipements
  • Management of data processing
  • Revamping campaign of obsolete equipments
  • Contracts drafting
  • Iternal and external audits
  • Control and definition of stocks
  • Management of Metering Maintenance & calibrations
  • Installation, start-up, management, data exploitation, maintenance of “MPFM” (multiphasic metering)
  • Management of more than 130 portable gas detector’s spread over 60 platforms and sites
  • Project management
  • Maintenance, Launch assitance - Main Cryogenic stage - Ariane V
Detailed Description
  • Preparation of installations (ground and aboard) for assembling and transferring the launcher
  • Preparation of installations (ground and aboard) for launching campaigns
  • Assistance during launching days (J0)
  • Re-validation of installations after launching
  • Maintenance of ground installations
  • Management of Documentation, instrumentation, valves and material obsolescence
  • Improvement and creation of procedures
  • Improvement of procedures for working time optimization (from 2008)
  • Training workshop creation to train new / young technicians & engineers arriving in Space Domain for the first time
  • Management of 15 peoples during the launch campaigns
  • Follow-up instrumentation and piping work, second Cryogenic stage - Ariane V
  • Management of subcontracting compagnies
Detailed Description
  • Millipores and leaks tests management
  • Advancement reporting
  • Supervising of the mounting instrumentation and piping in accordance with standards
  • Pre-adjustment instrumentation
  • Fertilizer production plant commissioning and start-up
Detailed Description
  • In charge of the Area Hot and cold Transfer of the instrumentation.
  • Management of the Commissioning Superintendents and the Field
    Area Transfer Teams, 16 peoples
  • Management of an Instrumentation Maintenance plan on a pumping station
Detailed Description
  • Scheduling
  • Works orders - Works permits
  • Maintenance procedures
  • Daily and monthly repports
  • Management of safety and toolbox meetings
  • Management: 4 peoples
  • Major re-fit of the nuclear submarine "Le Triomphant"
  • Commissioning of the necessary parts of the submarine towing
Detailed Description
  • Working in confidentiality (“secret Defence”) with associated constraints
  • Tests progress and reports
  • Management : 3 peoples
  • Telemetry loops transfers
  • Commissioning, construction, maintenance teams management, 6 peoples
Detailed Description
  • Construction supervision of PLC cabinets
  • Supports preparation of Instrumentation and PLC tests
  • PLC testing validation (FAT and SAT)
  • Installation Lead
  • Approx 1200 Fire & Gas items of equipments to manage
Detailed Description
  • Start-up assistance
  • Installation follow-up setting
  • Creation of procedures for preventive and corrective maintenance support
  • Definition of actions / Works procedures
  • On job training
  • Conformity and ergonomics control of installations
  • Proactive maintenance management
  • Management : 8 peoples
  • Integration testing of Ariane V on launching table and ground installation
Detailed Description
  • Testing the flow capacity of the piping and apply the correcting flow N2.H2 on the data meters
  • Synchro and setting of instruments
  • Management : 2 peoples
  • Management of 5 pesons for the commissioning
    (Revamping chlorinated units and ammonium storage)
Detailed Description
  • Hot and cold transfert
  • On job training
  • Organise and supervise the maintenance on 43 MW cogeneration unit
Detailed Description
  • Scheduled shutdown
  • Activity Planing
  • Supervise preventive maintenance
  • Study the organization of the work and distribute the activities of exploitation and maintenance
  • Functional details of cogeneration / boiler automatism
  • Management : 2 peoples
  • East side decennial shutdown, Ouest side Maintenance
  • Management of 3 peoples
Detailed Description
  • Hot and Cold transfers
  • Safety Trip-tests
  • On job training
  • Manage the As Built Loops diagrams
  • Start-up assistance
  • Define the interventions procedures
  • Work management, Glass furnace start-up assistance
  • Manage cable laying team and electrician wiring team (4+2 peoples)
  • Instrumentation Loops Tranferts
  • Safety Trip-tests
  • Management of 6 peoples
  • Instrumentation Restore to working after incident
  • Hot and Cold transfert